NPP Olkiluotto 3 EPR

Construction of the new AREVA EPR 3+gen. nuclear power plant in Finnland x x POYRY 2007-2009

NPP Flamanville 3 EPR

Construction of the new AREVA EPR 3+gen. nuclear power plant in France x x POYRY 2008-2010

NPP Taishan 1&2 EPR

Construction of the new AREVA EPR 3+gen. nuclear power plant in China x POYRY 2009-2010

NPP Mochovce 3&4

Completion of NPP Mochovce, Unit 3&4 x EGPi 2010

TPP Pruneřov

Reconstruction of power plant Prunerov in Czech Republic x EGPi 2011

Delta

Rack station design

x DELTE Electronics 2011

NPP Mochovce 3&4

Seismic analysis of equipment consoles, completion of NPP Mochovce, Unit 3&4

x x ENEL/VUJE 2011

NPP Mochovce 3&4

Seismic analysis of gamma spectrometer measuring device, completion of NPP Mochovce, Unit 3&4

x x ENEL/VUJE 2011

NPP Metsamor

Modernization of Metsamor power plant in Armenia x x VUEZ 2011

Autoservis Kolačín

AUTOSERVIS B.R.P Top in Velky Kolacín in Slovakia - Architectural design and project documentation x x BRPTop 2011

Agro Šaľa

Production of compound feed in Sala x x AGM 2011

NPP Mochovce 3&4

Stress and seismic analysis of pipe hangers and pipe supports, completion of NPP Mochovce, Unit 3&4

x TECHNOS 2011

NPP Mochovce 3&4

Processing of proof documentation including stress and seismic calculation and optimization of pipe routing, completion of NPP Mochovce, Unit 3&4

x TECHNOS 2011

NPP Mochovce 3&4

Processing of proof documentation in decontamination facility of NPP Mochovce, stress and seismic analysis & optimization, determining forces and anchor plate calculation

x TECHNOS 2011

NPP Mochovce 1&2

Project of changing of feedwater pipe for steam turbine in NPP Mochovce, Unit 1 x x MODRANY 2011

NPP Mochovce 1&2

Analysis of pipe resonance of accident feeding pipe system in NPP Mochovce, Unit 1&2 x MODRANY 2011

NPP Mochovce 3&4

Pipe stress and seismic analysis of Radiation control facility, completion of NPP Mochovce, Unit 3&4

x x EGPi 2011

TPP Yunus Emre

YUNUS EMRE 2x 145 MW CFPP

x EGPi 2011

CHP Duslo Sala

Pipelines stress analysis, urea production, chemical plant Duslo Sala, Slovakia x x DUSLO 2011

NPP Mochovce 1&2

Exchange flow jets of flow measurement, feedwater pipeline of steam turbine in NPP Mochovce, Unit2

x x MODRANY 2011

NPP Mochovce 3&4

Pipe stress analysis of HVAC drain system, complation of NPP Mochovce, Unit 3&4

x TECHNOS 2012

NPP Jaslovske Bohunice

System flow analysis in recirculation of active protection of the reactor, calculation of permissible flow and determination of throttling, NPP J.Bohunice Unit 2 x MODRANY 2012

NPP Mochovce 3&4

Processing of design specification of pipe system in radiation control facility, completion of NPP Mochovce, Unit 3&4

x x ENEL/VUJE 2012

WWTP Humenné

Independent stress analysis of wiping traverse platform of WWTP Humenne, Slovakia

x x ALVEST 2012

NPP Bohunice

Project documentation of the emergency system for transportation to NPP Metsamor

x ENEL/VUJE 2012

NPP Mochovce 3&4

Stress and seismic analysis of LPDU bracket including verification protocols

x ENEL/VUJE 2012

WPP Gabčíkovo

Design and calculation of lightweight construction of impeler inspection platform on hydroelectric power plant Gabcikovo VEG66028 x x SKODA 2012

SPP

Computational simulations to identify the cause of resonance in transportation of natural gas pipelines x eustream 2012

TPP Eemshaven

The design of piping, hangers and support, PDMS 3D model

x KIB, KUROTEC 2012

CHP Lenzing Tencel

Lenzing - TENCEL x KIB 2012

NPP Mochovce 3&4

The design of piping, hangers and support of room 504, completion of NPP Mochovce, Unit 3&4

x ENEL/VUJE 2013

NPP Mochovce 3&4

Advisory and consultancy services for HCC and SOR system, completion of NPP Mochovce, Unit 3&4

x ENEL/VUJE 2013

NPP Mochovce 3&4

Project documentation of radiation protection system, completion of NPP Mochovce, Unit 3&4

x x ENEL/VUJE 2013

WWTP SEINE AVAL

SEINE AVAL

x GDF SUEZ 2013

NPP Mochovce 3&4

Developing a catalog of standardized anchoring and fastening the pipes up to DN 50, completion of NPP Mochovce, Unit 3&4 x x ENEL/VUJE 2013

NPP Mochovce 3&4

Develop a methodology for the design, construction and installation of pipes up to DN 50, completion of NPP Mochovce, Unit 3&4 x x ENEL/VUJE 2013

NPP Mochovce 3&4

Stress and seismic analysis of krypton monitor bracket, completion of NPP Mochovce, Unit 3&4 x x ENEL/VUJE 2013

NPP Mochovce 3&4

Stress and seismic analysis of GIM202, TVD-SAM201 a SGLM202 monitor brackets, completion of NPP Mochovce, Unit 3&4 x x ENEL/VUJE 2013

TPP Eemshaven

TPP Eemshaven, The design of piping, hangers and support, PDMS 3D model, completion of TPP Eemshaven, Germany

x ETABO 2013